| Hwy. 93 South of Ravalli to Medicine Tree, Ravalli, Montana | |||||
| Contracting Agency: Montana Department of Transportation | |||||
|
|||||
This project entailed
excavation, reconstruction and realignment of a 5 mile roadway stretch,
involving excavation of 400,000 cubic meters, placement of special
borrow and base, installation of super span-multiplate wildlife
crossings, construction of a new bridge, and construction of a rest area
along side the National Bison Range on Highway 93. There was also work
through the town of Ravalli which consisted of
installing a storm
water sewer system along with sidewalk, curb & gutter, as well as an
intersection traffic light and street lighting. |
|||||
| Hwy. 95 Setters Road to Bellgrove, Worley, Idaho | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
![]() |
||||
Construction of 5 miles of new roadway with 1.1 million cubic
meters excavation, 270,000 metric ton of rock cap, 170,000 metric ton of
rock armor, 120,000 metric ton of drain rock. There was also 12,000
meters of edge drain piping installed with the majority of the work
completed during the 2005 & 2006 construction seasons. |
|||||
| Metaline Falls to the International Border, Metaline Falls, Washington | |||||
| Contracting Agency: Washington State Department of Transportation | |||||
|
![]() |
||||
Reconstruction of 13 miles of roadway to “all weather”
standards. Included 200,000 cubic yards of rock excavation, 230,000 ton
of rock cap. Challenges on this project were working in close proximity
to the traveling public and excavating rock cuts as high as 80 feet. |
|||||
| McCall East-West Loop, McCall, Idaho | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
Construction of 1.5 miles of new roadway which
required clearing, grubbing, earthwork, installation of an MSE
retainment wall, and drainage system. There was also demolition of
buildings, placement of aggregate base, paving, wetland construction,
and constructing a bridge crossing the
Payette
River. |
|||||
| Pleasantview Road, Post Falls, Idaho | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
Construction of approximately 2 miles of new roadway
requiring excavation, placement of base, asphalt paving, drainage,
lighting, and traffic signals. |
|||||
| Hwy. 191 North of Big Timber, Montana | |||||
| Contracting Agency: Montana Transportation Department | |||||
|
|||||
Approximately
9 miles of highway construction including over 680,000
cubic
meters of excavation, fill, bridge removal and construction, irrigation
pipe removal and installation, stream and storm water culverts, rip rap
placement, erosion and sediment control, guard railing, fencing, access
approaches, gravel and cement treated base placement, asphalt paving and
traffic control. This project was double shifted and successfully
completed approximately one season ahead of the state's allowable time
budget. |
|||||
| West Butte Road South of Prineville, Oregon | |||||
| Contracting Agency: Crook County Road Department | |||||
|
|||||
Realignment
and new construction of approximately 14 miles of roadway requiring drilling
and blasting, excavation of 200,000 cubic yards, fill, culvert and arched pipe
installation, storm water drainage, and a total of 250,000 tons of crushed
aggregate. |
|||||
| Gould City - Mayview Road Phase 2 | |||||
| Contracting Agency: County of Garfield | |||||
|
|||||
Reconstruction
and realignment of approximately 6 miles of roadway. The project included
excavation of 280,000 cubic yards of material and placement of embankment, installation
of storm culverts, rip rap, ballast, top course placement, paving, traffic
control, erosion and sediment control. |
|||||
| Dufort Road Stabilization | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
Reconstruct failed section of Dufort Road above the Pend Oreille River.
Work
required excavation of the failed granular sub base, and placement of
large rip rap from below the high water mark to the road elevation in
order to buttress the road and prevent future slippage. The work was
performed in a highly sensitive environmental area with steep slope. |
|||||
| Bischoff Canyon | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
Reconstruct
and realign 7.3 miles of U.S. Highway 89
Bischoff canyon to Geneva, including clearing and grubbing, blasting,
excavation, grading, fill, drainage, culverts, runoff control, wetlands
mitigation, base and surface paving. We operate 7days a week and 24
hours a day; and excavate over 2,600,000 cubic yards. This project was
in an environmentally and historically sensitive area with extensive
monitoring. |
|||||
| Hillsboro Street Interchange | |||||
| Contracting Agency: Washington Department of Transportation | |||||
|
|||||
Improvement
of 1.26 miles of US Hwy. 395. Removal of existing intersection, and constructing
a partial cloverleaf interchange. Included clearing and grubbing, removing
pavement, grading, drainage detention systems, crushed surfacing, paving
with asphalt and cement concretes, construction of reinforced concrete
bridge, approach slabs, erosion control, guardrail, curbs, gutters, sidewalks,
illumination, signing, storm and sanitary sewers, and water lines. |
|||||
| Flowery Trail Road | |||||
| Contracting Agency: Federal Highway Administration | |||||
|
|||||
This
project involved realigning Flowery Trail Road near Usk, Washington. It
included new drainage items and rock armoring of the slopes. The total
excavation is 600,000 CY with a large quantity of that being rock. |
|||||
| Blackfoot US Interstate 15 | |||||
| Contracting Agency: Idaho Department of Transportation | |||||
|
|||||
Construction
and repairing 2.0 miles of Snake River levee reconstruction and raising,
including grading, drainage, seepage cut-off trench, rip-rap, flood control
barriers, erosion control, and vegetation replacement. |
|||||
| Silverstar - North South Highway 41 | |||||
| Contracting Agency: Montana Department of Transportation | |||||
|
|||||
Seven
miles of reconstruction Highway 41 north of Twin Bridges, Montana. The
project included excavation, grading, approaches, drainage, culverts,
fencing, gravel road base, and paving. Placing 96" concrete pipe,
and rebuilding sections of the irrigation canal that meandered throughout
the project was both interesting and challenging. |
|||||
| Arrow to Turkey Farm, State Highway 3 | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
This
project consisted of the realignment and reconstruction of over six miles
of Idaho State Highway 3. Clearing, grubbing and rock Cap, Rip Rap and
rock and dirt excavation totaling over 800,000 cubic yards were included.
Scope stabilization, Gabian and MSE walls and a fish ladder added to the
challenges this project presented. |
|||||
| Wrenco Loop to Dover | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
This project involved realigning US Highway 2 near Sandpoint, Idaho. It included new drainage items, wetland mitigation and rock armoring of the slopes. The total excavation was 750,000 CY with a large portion of that being rock. |
|||||
Yakima Training Center, Road Upgrade Mitigation Phase 5A |
|||||
| Contracting Agency: Army Corps of Engineers, Yakima Training Center | |||||
|
|||||
|
|||||
| Hill Road | |||||
| Contracting Agency: Ada County Highway District | |||||
|
|||||
Construction of 2 miles of new roadway, reconstruction of intersection at Gary Lane and Horseshoe Bend, Rd., sewer line installation, storm drain and irrigation pipe retaining wall, pre-cast concrete bridge, signal light installation, and landscaping. Project included hauling, placement and compaction of 300,000 thousand cubic yards of embankment. |
|||||
| St. Joe River Road to Meadowhurst Rd. and Reid's Corner near St. Maries | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
|
The second project ('Reid's Corner') was a floodplain of the St. Joe River and involved a cut section through a large forested hill, realigning an existing hairpin turn into a straight highway section and blending into existing SH-3 to the north. Ground disturbing activities included clearing and grubbing, excavation (both of soil and existing asphalt highway surface), cut and embankment construction, drainage construction, and wetland mitigation construction. |
|||||
| U.S. 95 Slide Repair North of Riggins, Idaho | |||||
| Contracting Agency: Idaho Transportation Department | |||||
|
|||||
The
primary purpose of the work was to mitigate an active slide area by restoring
the slide mass located at milepost 210.5 on U.S. Highway 95, to a more
structurally capable slope. Work involved major earthwork (excavation
of over 220 thousand cubic yards of material), material wasting activities
and the placement of base rock and a plantmix overlay. Work also involved
the placement of new culverts, guardrail and rock fall protection fence.
This project was particularly challenging to our operators since the cut
extended 600+ feet above the existing road. |
|||||
| Mill Road to Tiger SR 20 | |||||
| Contracting Agency: Washington State Department of Transportation | |||||
|
|||||
This project required 11 miles of reconstruction and drainage to create a frost-free road. Included in this work was clearing and grubbing, re-fencing, slope flattening and widening, controlled blasting of rock face, drainage, erosion control, aggregate surfacing, gabion walls, guardrail and traffic control. This project required working in USFS sensitive areas. Excavation alone exceeded 200,000 cubic meters. Due to extremely wet conditions, slope armoring was required by change order to control erosion. |
|||||
| Spruce Canyon SR-20 | |||||
| Contracting Agency: Washington Department of Transportation | |||||
|
|||||
This
project required 11 miles of reconstruction and drainage to create a frost-free
road. Included in this work was clearing and grubbing, re-fencing, slope
control, aggregate surfacing, gabion walls, guardrail and traffic control.
this project required working in USFS sensitive areas. Excavation alone
exceeded 200,000 cubic meters. Due to extremely wet conditions, slope
armoring was required by change order to control erosion. |
|||||
| Tomcat Hill US 23/26/93 | |||||
| Contracting Agency: Idaho Transportation Department, February 1996 to June 1996 | |||||
|
|||||
This project,
located on US 23/26/93, aligned two miles of highway that changed the
overall grade percent while also creating a passing lane. |
|||||
| If you would like more information or have a project you would like to speak with us about, please close this window and fill out our contact form on our 'contact page' or contact us by phone, e-mail or in person. We look forward to hearing from you. | |||||