Your regional highway, earthen construction, and excavation company with a rich history in the Northwest.

Roosevelt Regional Landfill – Roosevelt, WA

Ash Cell L
Contracting Agency: Republic Services

Total Contract:
Completion Date: 2015

Ash Cell L was a small project which was completed within a six week time period. The project consisted of 47,000 cubic yards of excavation. 7,000 cubic yards of this material went to embankment while the remainder went to a nearby stockpile. After a liner system was installed 150 feet of leachate collection pipng and 3,500 tons of drain rock were placed on top of the liner as an operations layer.